Completed in 2009, the SR 414 and SR 429 Interchange project was a major roadway and bridge project that consisted of approximately 1.7 miles of 6 lane mainline roadway, two 6 lane mainline bridges, two county road bridges that flyover the mainline roadway, 160,000 square feet of MSE walls and 1,600,000 cubic yards of excavation and embankment, road base with asphalt, all utilities, storm sewer. Steel sheet piling, CIP concrete, Mass grading with erosion control measures.
Project Details
- Owner: Orlando-Orange County Expressway Authority
- Location: Sanford, Florida, United States
- Performed as: Johnson Bros. Corporation
- Project value: $36,632,221.00
- Completion Date: January 2009