Completed in 2006, the SR 39A (Alexander St.) from US 92 (W Tjonotosassa St.) to SR 400 (I-4) project consisted of the construction of an additional I-4 off ramp and interchange. The work consisted of erosion/sedimentation control; mass earthwork/fine grading; stormwater ponds; dewatering; flexible paving and roadways; sidewalks; slope paving; gravity and pressure utility systems; directional boring & casing; sodding; piling; concrete; guardrails; curb & gutter; shoulder drains and structures, etc.
Project Details
- Owner: Florida Department of Transportation
- Location: Plant City, Florida, United States
- Performed as: Johnson Bros. Corporation
- Project value: $12,264,526.00
- Completion Date: November 2006