Completed in 2004 by Southland Contracting, the Southwest Sanitary Sewer System Project consisted of installing approximately 300 linear feet of 42-inch steel casing, 200 linear feet of 36-inch steel casing, 100 linear feet of 30-inch steel casing, 550 linear feet of 30-inch steel casing by jack and bore methods, and 850 linear feet of 20-inch steel casing by jack and bore methods.
Project Details
- Owner: City of Midlothian
- Location: Midlothian, Texas, United States
- Performed as: Southland Contracting, Inc.
- Project value: $536,962.00
- Completion Date: April 2004