Completed in 2007 by Southland Contracting, the South Lubbock Drainage Project consisted of installing approximately 6,425 linear feet of 54-inch pipe cut by 72-inch Tunnel Boring Machine (TBM) and 1,929 linear feet of 36-inch pipe cut by 52-inch TBM. Project included a crossing under Hwy 84. Included 12 shafts; seven (7) of the shafts were of the following depths: 46 foot, 41 foot, 41 foot, 47 foot, 52 foot, 48 foot, & 41 foot.
Project Details
- Owner: City o Lubbock
- Location: Lubbock, Texas, United States
- Performed as: Southland Contracting, Inc.
- Project value: $5,902,597.00
- Completion Date: March 2007