Completed in 2017 by Oscar Renda Contracting, the San Antonio River Outfall Project No. 2B Project consisted of approximately 10,000 linear feet of 48-inch sanitary sewer main, three siphon systems approximately 2,200 linear feet of large barrel HDPE sanitary sewer siphon pipe, 2,200 linear feet of small barrel HDPE sanitary sewer and 2,200 lf of HDPE air piping. Installation of manholes and appurtenances, reinforced concrete junction boxes, pavement demolition and replacement. Tree protection, fencing, revegetation and erosion control.
Project Details
- Owner: San Antonio Water Systems
- Location: San Antonio, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $794,250.00
- Completion Date: December 2017