Route 86 Long Creek Bridge Replacement over Table Rock Lake

Bridge replacement project that consists of constructing a new bridge located South of the existing structure. Scope of work includes demolition and removal of existing bridge, clearing and grubbing, excavation, base work, drilled shafts 5 to 11-foot in diameter, steel piling, 2,001 tons of fabricated steel plate girders, cast-in-place concrete formwork and installation of various precast elements. Additional work includes various asphalt/concrete paving, guardrail installation, retaining wall, navigational lighting, signage, traffic control, and erosion control.

Project Details

  • Owner: Missouri Department of Transportation (MoDOT)
  • Location: Ridgedale, Missouri, United States
  • Performed as: American Bridge Company
  • Project value: $67,581,485.00
  • Completion Date: September 2025