Proposed pedestrian bridge over the Thames- vertical lift or swing bridge at Canary Wharf. ABI to act as sub-consultants to Arcadis to advise on means, methods, and costs.
Project Details
- Owner: Transport for London
- Location: England, United Kingdom
- Performed as: American Bridge Company
- Project value: $0.00
- Completion Date: January 2018



