Completed in 2015 by Oscar Renda Contracting, the Proposed 66-inch Water Line along Almeda Genoa Road and Monroe Road from Moers Road to Airport Boulevard Project consisted of approximately 11,400 linear feet of 66-inch waterline, valves and appurtenances. Expansion of one lane, concrete pavement repair and storm drain installation. Traffic control, detours and certified flagging services for work associated within the street. Remove and replacement of concrete paving consisting of: 34,500 square yards of concrete paving with 41,000 square yards of lime Stabilized Subgrade and 4300 square yards of Asphalt paving. The scope of work included paving removal and replacement, excavation for pipeline installation, and final restoration.
Project Details
- Owner: City of Houston
- Location: Houston, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $11,391,196.00
- Completion Date: May 2015