Completed in 2005, the Pinellas Trial Pedestrian Flyover Bridge on SR 441 project consisted of the erection of a pedestrian bridge over US 441 along Pinellas Trail. The work included erection of prestressed concrete girders that were 170 linear feet long; piling; girders; caps & columns; cast-in-place (CIP) concrete; decking; cages over bridge; and maintenance of traffic (MOT).
Project Details
- Owner: Florida Department of Transportation
- Location: St. Petersburg, Florida, United States
- Performed as: Johnson Bros. Corporation
- Project value: $2,196,199.00
- Completion Date: March 2005