Phase 2B – Raw Water Intake Structure

Completed in 2005 by Southland Contracting, the Phase 2B – Raw Water Intake Structure Project consisted of installing approximately 240 linear feet of 36-inch raw water line into Lake Dunlap for Lake intake structure. The water line was installed by microtunnel methods.

Project Details

  • Owner: Canyon Regional Water Authority
  • Location: Cedar Park, Texas, United States
  • Performed as: Southland Contracting, Inc.
  • Project value: $1,061,871.00
  • Completion Date: April 2005