Completed in 1972 by American Bridge, the Perris Dam Outlet Works project consisted of the fabrication, transportation, and installation of 1,600 feet of 12-foot diameter tunnel liner inside a rock tunnel for the Inland Feeder – Lakeview Pipeline project at Perris Dam.
Project Details
- Owner: Metropolitan Water Distric of Southern California (MWD)
- Location: Perris, California, United States
- Performed as: American Bridge Company
- Project value: $8,103,664.00
- Completion Date: May 1972



