Pekin Bridge

Completed in 1982 by American Bridge, the Pekin Bridge project consisted of a nine-span bridge over the Illinois River, featuring a 1,320-foot three-span steel box girder river section and steel plate girder approaches. The orthotropic roadway deck included longitudinal and transverse welds.

Project Details

  • Owner: Illinois Department of Transportation (IDOT)
  • Location: Pekin, Illinois, United States
  • Performed as: American Bridge Company
  • Project value: $4,064,949.00
  • Completion Date: May 1982