Oncor Electric Tunnel Bachman Water Treatment Plant

Completed in 2003 by Southland Contracting, the Oncor Electric Tunnel – Bachman Water Treatment Plant Project consisted of installing approximately 273 linear feet of 36-inch bore for electrical and approximately 25 linear feet of 36-inch bore for electrical under railroad.

Project Details

  • Owner: TXU Electric
  • Location: Dallas, Texas, United States
  • Performed as: Southland Contracting, Inc.
  • Project value: $123,570.00
  • Completion Date: September 2003