Completed in 1980 by American Bridge, the Newburgh Beacon Bridge No. 2 project consisted of fabricating and erecting the 6,336′ steel truss bridge using balanced cantilever, float-in, and hoisting methods. The 25,753-ton structure is a twin to Bridge No. 1.
Project Details
- Owner: New York State Bridge Authority (NYSBA)
- Location: Newburgh/Beacon, New York, United States
- Performed as: American Bridge Company
- Project value: $51,724,000.00
- Completion Date: October 1980


