Naval Reserve Lift Bridge Alterations – Fab

Completed in 2005 by American Bridge, the Naval Reserve Lift Bridge Alterations – Fab project consisted of modifying a 406′ bridge by raising towers to 215′, increasing lift span clearance to 150′. AB removed, rehabilitated, and reinstalled the 240′ lift span, replaced mechanical and electrical systems, and fabricated 614 tons of new steel and 8,000 SF of steel grid decking.

Project Details

  • Owner: U.S. Army Corps of Engineers (USACE)
  • Location: Philadelphia, Pennsylvania, United States
  • Performed as: American Bridge Company
  • Project value: $2,529,021.00
  • Completion Date: May 2004