Completed in 2008 by Southland Contracting, the Mountain Creek Subsystem MC-5 & MC-6 Interceptor Project 1A Project consisted of installing approximately 1,480 linear feet of 124-inch diameter tunnel, lined with steel ribs and wood lagging using a tunnel boring machine in depths of up to 70 feet.
Project Details
- Owner: Trinity River Authority
- Location: Grand Prairie, Texas, United States
- Performed as: Southland Contracting, Inc.
- Project value: $1,924,000.00
- Completion Date: March 2008