Bridge replacement of the existing eastbound US150 (McCluggage) bridge over the Illinois River, which will include interchange improvements at the US150 IL29 Interchange and the US15/US24 IL116 Interchange. Construction consists of road widening, drainage improvements, signing, landscaping, bicycle and pedestrian walkways, and three new structures. Scope of work includes earthwork, base work, paving, resurfacing, drainage improvements, flatwork, removal of existing structures, and construction of structures. Three Structures: two bridges carrying eastbound US150 over IL29 and the Illinois River, and the culvert under the Southwest ramp of the US150/IL116 Interchange.
Project Details
- Owner: Illinois Department of Transportation
- Location: Peoria, Illinois, United States
- Performed as: Johnson Bros. Corporation
- Project value: $169,090,196.00
- Completion Date: September 2025



