Lake Tawakoni Water Supply Project Contract No. 3 – Lake Pump Station Sump and Intake

Completed in 2007 by Oscar Renda Contracting, the Lake Tawakoni Water Supply Project Contract No. 3 – Lake Pump Station Sump and Intake project consisted of a 36-inch internal diameter sump pit approximately 68-foot-deep and a 14-foot internal diameter tie-in vault to connect to an existing City of Terrell intake. Installation of an 84-inch tunnel that will connect the sump pit and the tie-in vault.

Project Details

  • Owner: North Texas Municipal Water District
  • Location: Rockwall, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $3,045,128.00
  • Completion Date: April 2007