Completed in 2007 by Oscar Renda Contracting, the Lake Tawakoni Water Supply Project Contract No. 3 Lake Pump Station Sump and Intake project consisted of a 36-inch internal diameter sump pit approximately 68-foot-deep and a 14-foot internal diameter tie-in vault to connect to an existing City of Terrell intake. Installation of an 84-inch tunnel that will connect the sump pit and the tie-in vault.
Project Details
- Owner: North Texas Municipal Water District
- Location: Rockwall, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $3,045,128.00
- Completion Date: April 2007