Johnson Creek Interceptor Project

Completed in 2009 by Southland Contracting, the Johnson Creek Interceptor Project consisted of installing approximately 7,300 linear feet of 54-inch gravity sewer main by Tunnel Boring Machine (TBM), 997 linear feet of 54-inch gravity sewer main, 2,796 linear feet of 4-inch thru 33-inch diameter gravity sewer main, 8,154 linear feet of 12-inch and 15-inch liner pipe, 485 linear feet of 24-inch Steel Casing, one sanitary sewer meter station package, 34 sanitary sewer manholes, 30 manhole rehabilitations, 36 existing manhole obliterations, and one biofiltration system.

Project Details

  • Owner: Trinity River Authority
  • Location: Grand Prairie, Texas, United States
  • Performed as: Southland Contracting, Inc.
  • Project value: $13,259,324.00
  • Completion Date: October 2009