Completed in 2021 by Oscar Renda Contracting, the Integrated Pipeline (IPL) Sections 10 and 11 Project consisted of the installation of approximately 66,900 linear feet of 84-inch water line by combination of open cut and tunneling, 84-inch butterfly valves (provided by owner), connections and appurtenances along with proposed alignment of Sections 10 and 11. Additional work included a cathodic protection system, providing associated structures, hauling, traffic control, and various site, civil and roadway improvements (concrete work and paving, clearing, grading, flexbase repair, fencing, erosion control, and final restoration).
Project Details
- Owner: Tarrant Regional Water District
- Location: Mansfield, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $43,815,594.00
- Completion Date: September 2021