I-95 @ Becker Road Interchange

Completed in 2009, the I-95 at Becker Road Interchange project consisted of the construction of 6-lane tight diamond interchange at Becker Road and I-95. The construction included approximately 1.25 miles of 6 lane roadway, 8,000 feet of ramp construction, 17,700 linear feet of drainage ranging in size from 15-inch to 84-inch reinforced concrete pipe (RCP), 11,000 linear feet of water and forcemain installation, widening of 2 interstate bridges, 9,400 linear feet of concrete piling, 14,200 square feet of MSE Walls, and 39,000 square feet bridge over I-95. 258 linear feet Mainline Bridge, 620 linear feet of inside lane canal widening additions (310 each). This project was completed 3 months ahead of schedule.

Project Details

  • Owner: City of Port St. Lucie
  • Location: Port St. Lucie, Florida, United States
  • Performed as: Johnson Bros. Corporation
  • Project value: $37,109,346.00
  • Completion Date: August 2009