I-4 and 17-92 Off Ramp over CR

Completed in 2008, the I-4 and 17-92 Off Ramp over CR project consisted of the major bridge construction of off ramp on I-4 at US 17-92 and over CSX RR mainline. The bridge consisted of 24 spans at 140 feet long each. Active construction work zone along I-4, MOT, storm water retention ponds, clearing & grubbing, excavation, drainage w/ structures, dewatering, utilities, embankment, box culverts, concrete piling, caps, decks, girders over RR tracks, cofferdams, erosion control/ turbidity, grassing & sodding, barrier walls, MSE walls, rip rap rubble, gabions, guardrails, sidewalks and driveways, fencing, drainage structures, etc.

Project Details

  • Owner: Florida Department of Transportation
  • Location: Sanford, Florida, United States
  • Performed as: Johnson Bros. Corporation
  • Project value: $23,601,567.00
  • Completion Date: April 2008