Consisting of two parallel double-track structures each made up as follows: one through riveted span, 145 ft 0-in c-c; three through pin-connected spans, each 217 ft 0-in c-c; one deck plate-girder span, 34 ft 8-in o-o; one Scherzer type of Bascule span, 108 ft 3-in; one deck plate-girder span, 108 ft 0-in o-o. Weight 7,829 tons.
Project Details
- Owner: New york, New Haven & Hartford Rialroad
- Location: Naugatuck Junction, Connecticut, United States
- Performed as: American Bridge Company
- Completion Date: 1906



