Henry Hudson Bridge

Completed in 1936 by American Bridge, the Henry Hudson Bridge project consisted of the fabrication and erection of a steel deck arch bridge. The structure includes one 800-foot (244m) arch span, two 45-foot (14m) tower spans, and ten 60-foot (18m) plate girder spans. The bridge was constructed without hinges. In 1938, American Bridge also completed the addition of a second-level deck.

Project Details

  • Owner: Metropolitan Transportation Authority New York City Transit – Bridges and Tunnels
  • Location: New York, New York, United States
  • Performed as: American Bridge Company
  • Project value: $254,833.00
  • Completion Date: December 1936