Completed in 2024 by Oscar Renda Contracting, the Granville Bridge Interim Connector project consisted of reconstructing 120-year-old bridge infrastructure that entails removal of Northern loops and reconfiguring bridge deck to accommodate pedestrians, a rolling pathway and cyclist. Subcontract scope of work includes clearing and grubbing, grading, excavation/trenching, concrete work (reinforcement, cast-in-place, precast), base work, and all associated utility work (storm sewers, sanitary sewers, and watermains). Additional work includes temporary structures, utilities, and facilities, installation of manholes and catch basins, traffic control and erosion control.

Project Details

  • Owner: City of Vancouver
  • Location: Vancouver, British Columbia, Canada
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $5,441,751.00
  • Completion Date: November 2024