Golondrinas Bridge

Completed in 1929 by American Bridge, the Golondrina’s Bridge project consisted of a 404′ single-track railroad bridge with a 3-hinged arch main span of 308′ and two deck plate girder approach spans. The project was erected over the swift Magdalena River.

Project Details

  • Owner: Ferrocarril Tolima Huila Caqueta
  • Location: Columbia, Columbia
  • Performed as: American Bridge Company
  • Project value: $0.00
  • Completion Date: September 1929