Completed in 1929 by American Bridge, the Golondrina’s Bridge project consisted of a 404′ single-track railroad bridge with a 3-hinged arch main span of 308′ and two deck plate girder approach spans. The project was erected over the swift Magdalena River.
Project Details
- Owner: Ferrocarril Tolima Huila Caqueta
- Location: Columbia, Columbia
- Performed as: American Bridge Company
- Project value: $0.00
- Completion Date: September 1929



