Completed in 2013 by American Bridge, the Golden Beach Bridge Replacement project involved removing and replacing two bridges and their abutments. The scope included new sewer installation, ornamental lighting, soil improvements, paving, and landscaping at the approaches. The 100′ bridges were founded on 42 drilled shafts, cast-in-place pile caps, precast deck panels, and steel sheet pile abutments.
Project Details
- Owner: Town of Golden Beach
- Location: Golden Beach, Florida, United States
- Performed as: American Bridge Company
- Project value: $7,340,518.00
- Completion Date: April 2015



