Completed in 2006 by American Bridge, the GOAA BP-359 Airside No. 2 Extension, Wings 7 and 9 project expanded Airside Two at Orlando International Airport by adding 72,000 SF of terminal space. The project included extending two wings with a 100 two-story addition, six new passenger boarding bridges, office and warehouse space, and site work. Structural components were built with concrete foundations, masonry, steel, and curtain walls. The exterior featured a membrane roof, skylights, and architectural panels, while the interior included drywall, stainless steel, and carpeting. The site work included apron paving, fueling valves, lighting, and parking striping.
Project Details
- Owner: Greater Orlando Aviation Authority
- Location: Orlando, Florida, United States
- Performed as: American Bridge Company
- Project value: $16,874,792.00
- Completion Date: March 2006