Fred Hervey WRP IMP Project

This Project consists of the installation of 1,600 linear feet of 30-inch pipe with multiple fittings, a pressure regulating valve and a connection to the plant headworks. This emergency work needed to be done in an extremely short window and crews were able to complete it in half the allotted time.

Project Details

  • Owner: El Paso Water Utilities
  • Location: El Paso, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Completion Date: June 2023