Completed in 2005, the FDOT Hurricane Emergency Work – Brevard County (E 5H59) Hwy 1/Port Malabar Road project consisted of the demolition of damaged area; clear and grub all trees and debris; repair slope and enbankments; repair all areas washed out by the hurricane storm surge. Add embankment; rubble Rip Rap; concrete sidewalks; guardrails; maintenance of traffic (MOT); erosion control and turbidity control; grassing and sodding; utilities; drainage; excavation; etc.

Project Details

  • Owner: Florida Department of Transportation
  • Location: Melbourne, Florida, United States
  • Performed as: Johnson Bros. Corporation
  • Project value: $5,431,450.00
  • Completion Date: September 2005