Entergy Power Group Transmission Line

Completed in 2002 by Oscar Renda Contracting, the Entergy Power Group Transmission Line project was a Fast Track Design Build Project with Winn Engineers, consisting of Installing a Pump Station and 143,000 linear feet of 20-inch ductile iron pipe and HDPE for power plant. Project was built and in service in 4 months. Soil conditions were wet sand, sandy clay and cemented sands.

Project Details

  • Owner: Energy Power Group
  • Location: Longview, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $9,300,000.00
  • Delivery Model: Design-Build
  • Completion Date: September 2002