Emergency Repair 82-inch RCP-BRIC Segment IV

Completed in 2023 by Oscar Renda Contracting, the Emergency Repair 82-inch RCP-BRIC Segment IV Project consisted of the emergency repair of collapsed pipe with scope of work that includes 15-feet of excavation to the top of a 84-inch reinforced concrete pipe (RCP) for repairs, backfill, flowable fill, concrete encasement, clear and grub, temporary all-weather access driveway, and fencing removal and repair.

Project Details

  • Owner: Trinity River Authority of Texas
  • Location: Grand Prairie, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $489,710.00
  • Completion Date: December 2023