Eastgate Trunk Improvements

Completed in 1983 by Mole Constructors, the Eastgate Trunk Improvements project involved approximately 1,800 linear feet of tunneling, employing a 76-inch Scott Tunnel Boring Machine. The tunnel was supported by an R&B (rock and bolt) primary liner with a 36-inch RCP (reinforced concrete pipe) secondary liner. The tunneling occurred through methanol-laden clays and utilized cellular concrete annulus backfill grouting.

Project Details

  • Owner: Municipality of Metro Seattle
  • Location: Eastgate, Washington, United States
  • Performed as: Mole Constructors, Inc.
  • Project value: $2,817,777.00
  • Completion Date: 1983