Completed in 2007 by Oscar Renda Contracting, the East Fork Raw Water Supply Project – Northern Segment B project consisted of approximately 57,500 linear feet of 84-inch diameter and 3,000 linear feet of 72-inch diameter steel pipe. Approximately 750 linear feet of 120-inch tunnel. The scope of work included clearing, grading and excavation for pipeline installation, rip rap installation and site restoration. Installation of two weir structures and an outfall structure at Lake Lavon. Installation of flow meter vault.
Project Details
- Owner: North Texas Municipal Water District
- Location: Wylie, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $39,788,000.00
- Completion Date: August 2007