Eagle Mountain 72-inch Raw Water Transmission Pipeline

Completed in 2007 by Oscar Renda Contracting, the Eagle Mountain 72-inch Raw Water Transmission Pipeline project consisted of approximately 15,200 linear feet of 72-inch raw water pipe to service Raw Water Pump Station to Eagle Mountain Water Treatment Plant. A 72-inch butterfly valve and vault with associated piping. Connection to an existing 54-inch raw water pipeline. Cathodic protection and modifications and repairs to existing valves.

Project Details

  • Owner: City of Fort Worth
  • Location: Fort Worth, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $7,144,625.00
  • Completion Date: October 2007