Completed in 2007 by Oscar Renda Contracting, the Eagle Mountain 72-inch Raw Water Transmission Pipeline project consisted of approximately 15,200 linear feet of 72-inch raw water pipe to service Raw Water Pump Station to Eagle Mountain Water Treatment Plant. A 72-inch butterfly valve and vault with associated piping. Connection to an existing 54-inch raw water pipeline. Cathodic protection and modifications and repairs to existing valves.
Project Details
- Owner: City of Fort Worth
- Location: Fort Worth, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $7,144,625.00
- Completion Date: October 2007



