DWR Pastoria Siphon

Completed in 1971 by American Bridge, the DWR Pastoria Siphon project consisted of fabricating and installing welded steel water supply siphons and pipelines. The lower slope was erected using a skidway system, while the upper slope was erected with a crawler crane on a wedge.

Project Details

  • Owner: Department of Water Resources, State of California
  • Location: Lebec, California, United States
  • Performed as: American Bridge Company
  • Project value: $2,084,940.00
  • Completion Date: January 1971