Completed in 2009 by Oscar Renda Contracting, the Duck Creek Interceptor Sewer System Sections I, II, III and Eastern Hills Sewer consisted of the construction of four sections. Section I included approximately 18,770 linear feet of 48-inch of IPS DR-17 HDPE pipeline, 19,203 linear feet of 8-inch DIPS DR HDPE pipe, 19,550 linear feet of 4-inch conduit and associated valves, structures, appurtenances and misc. work. Section II includes approximately 17,351 linear feet of 48-inch FRP interceptor sewer, junction structures, manholes and misc. work. Section III includes approximately 38,760 linear feet of 8-inch DIPS 7.3 DR HDPE pipe, 40,109 linear feet of 4-inch conduit, 15,500 linear feet of 60-inch FRP interceptor sewer, 24,500 linear feet of 66-inch interceptor sewer, manholes and related appurtenances. Site restoration, paving and erosion control. Traffic control, barricades and flagging service for work within the work ways and road area. Eastern Hills section includes 4,004 linear feet of various size pvc pipeline, concrete paving and site restoration.
Project Details
- Owner: City of Garland
- Location: Garland, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $41,437,743.00
- Completion Date: August 2009