Completed in 1973 by American Bridge, the Detroit Bulk Mail Facility project consisted of fabricating and erecting an “L” shaped facility (432′ x 482′) with a 240′ x 433′ wing. The office bay (48′ x 440′) had three levels of column and beam framing, with the balance of the structure made of column, truss, purlin, bracing, and sidewall framing.
Project Details
- Owner: US Postal Service
- Location: Detroit, Michigan, United States
- Performed as: American Bridge Company
- Project value: $0.00
- Completion Date: November 1973



