Chicago Skyway Truss Repair Viaduct Calumet River Bridge – Fab

American Bridge detailed and fabricated 500,000 lbs. of structural steel for member replacements and repairs.  Work had to be completed under 4 month schedule to meet the 8 month construction duration.  An approximately equal amount of material was supplied by Munster.

Project Details

  • Owner: City of Chicago
  • Location: Chicago, Illinois, United States
  • Performed as: American Bridge Company
  • Project value: $650,742.00
  • Completion Date: January 2003