Prime contract for fabrication and erection of nine-span bridge on the Chicago Skyway over the Calumet River. The bridge includes 3 x 208′ deck truss spans for the north approach, 3 x 178′ deck truss spans for the south approach, and a 3 span 1,300′ cantilevered truss with a 650′ main span and 325′ anchor arms. The bridge was erected using falsework bents to construct the anchor arms and cantilevering the main span from two fronts. An American Bridge S-2 traveler derrick was used for erection. 8,777 tons of fabricated steel.
Project Details
- Owner: Chicago Department of Transportation
- Location: Chicago, Illinois, United States
- Performed as: American Bridge Company
- Project value: $994,697.00
- Completion Date: June 1958