Completed in 2008, the Canoe Creek Road Bridge Replacement project consisted of the replacement of the existing Canoe Creek Bridge and Associated Roadway. Installation of temporary “ACROW” bridge and build roadway, demolish existing bridge, build new 135 linear feet slab span concrete bridge with prefab concrete caps on pipe piling. Build new roadway to new bridge, open road and then demo “ACROW” bridge and deliver to the owner, Osceola County. Shape canal and realign the canal, then line with rip rap rubble.
Project Details
- Owner: County of Osceola
- Location: St. Cloud, Florida, United States
- Performed as: Johnson Bros. Corporation
- Project value: $3,939,858.00
- Completion Date: June 2008



