Completed in 2016 by Southland Contracting, the C-13 Broadway Corridor Project, Package A Project consisted of approximately 500 linear feet of 120-inch tunnel for a three barrel inverted siphon, siphon structures, diversion structures, 81 linear feet of 60-inch fiberglass reinforced pipe (FRP) gravity sewer main, 41 linear feet of 66-inch FRP gravity sewer main and 778 linear feet of 36-inch recycled water line relocation.
Project Details
- Owner: San Antonio Water System
- Location: San Antonio, Texas, United States
- Performed as: Southland Contracting, Inc.
- Project value: $6,146,960.00
- Completion Date: April 2016