C-13 Broadway Corridor Project, Package A

Completed in 2016 by Southland Contracting, the C-13 Broadway Corridor Project, Package A Project consisted of approximately 500 linear feet of 120-inch tunnel for a three barrel inverted siphon, siphon structures, diversion structures, 81 linear feet of 60-inch fiberglass reinforced pipe (FRP) gravity sewer main, 41 linear feet of 66-inch FRP gravity sewer main and 778 linear feet of 36-inch recycled water line relocation.

Project Details

  • Owner: San Antonio Water System
  • Location: San Antonio, Texas, United States
  • Performed as: Southland Contracting, Inc.
  • Project value: $6,146,960.00
  • Completion Date: April 2016