Bois d’Arc Lake Treated Water Pipeline – Segment C

Project consisted of installing steel water line to include all appurtenances. Scope of work included 51,761 LF of 90-inch class 175 steel water line by open cut and 1,164 LF of 90-inch class steel water line installed in tunnels. Additional work included installation of 21 manholes, 2 blow off valves, road crossing, creek and river crossings, and cathodic protection system installation.

Project Details

  • Owner: North Texas Municipal Water District
  • Location: Leonard, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $21,377,404.00
  • Completion Date: July 2024