Bois d’Arc East Fork Trinity River Tunnel – Segment E

Completed in 2023 by Oscar Renda Contracting, the Bois d’Arc East Fork Trinity River Tunnel – Segment E Project consisted of one 35-foot diameter by 80-foot-deep tunnel shaft and one 25-foot diameter by 75-foot-deep tunnel shaft. The scope of work included installation and grouting of 2,532 linear feet 84-inch steel waterline, installation of vertical riser pipes in shafts, and backfill shafts with concrete and flowable fill.

Project Details

  • Owner: North Texas Municipal Water District
  • Location: Leonard, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $12,431,000.00
  • Completion Date: December 2023