Boeing Sub Assembly Buildings; Clean and Paint Buildings

Completed in 1968 by American Bridge, the Boeing Sub Assembly and Clean & Paint Buildings project included three structures totaling 804,000 SF. The major assembly building measured 754′ x 100′, the sub-assembly building 402′ x 600′, and the clean, seal & paint building 402′ x 400′, all 113′-6″ high. Simultaneously, American Bridge also constructed the 747 Final Assembly Building, bringing the total project area to 1,326,600 SF.

Project Details

  • Owner: Boeing
  • Location: Everett, Washington, United States
  • Performed as: American Bridge Company
  • Project value: $9,677,806.00
  • Completion Date: January 1968