Completed in 1968 by American Bridge, the Boeing Sub Assembly and Clean & Paint Buildings project included three structures totaling 804,000 SF. The major assembly building measured 754′ x 100′, the sub-assembly building 402′ x 600′, and the clean, seal & paint building 402′ x 400′, all 113′-6″ high. Simultaneously, American Bridge also constructed the 747 Final Assembly Building, bringing the total project area to 1,326,600 SF.
Project Details
- Owner: Boeing
- Location: Everett, Washington, United States
- Performed as: American Bridge Company
- Project value: $9,677,806.00
- Completion Date: January 1968