Blue River Force Main

Completed in 1982 by Mole Constructors, the Blue River Force Main project involved the excavation of 8,300 linear feet using a 102-inch Lovat Tunnel Boring Machine. Rock and bolt (R&B) was utilized as tunnel support during the excavation through monolithic shale rock at depths ranging from 35 feet to 102 feet. Post-monolithic contact grouting was applied as part of the project.

Project Details

  • Owner: Pollution Control Department of Kansas City
  • Location: Kansas City, Missouri, United States
  • Performed as: Mole Constructors, Inc.
  • Completion Date: 1982