Black River Tunnel

Completed in 1978 by Mole Constructors, the Black River Tunnel project entailed roughly 13,000 linear feet of tunnel, utilizing a 102-inch Lovat TBM and a 110-inch Scott Spider. The tunnel, ranging from 102 to 110 inches, was unlined and unsupported. Excavation was carried out through cooper marl at depths of 100 feet to 110 feet.

Project Details

  • Owner: Amoco Chemical and City of Charleston
  • Location: Charleston, South Carolina, United States
  • Performed as: Mole Constructors, Inc.
  • Project value: $3,405,637.00
  • Completion Date: 1978