Completed in 2025 by Oscar Renda Contracting, the Arcadia Lake Water Treatment Plant (ALWTP) Intake and Low Level Pump Station project consisted of a new Arcadia Lake Intake and Pump Station (INT-01). Scope of work includes excavation within Arcadia Lake (for receiving the tunnel boring machine in three locations), mass earthwork, below grade shaft (for TBM launch, placing of concrete, and mechanical works), construction of pump station (including equipment and appurtenances over wet well), constructing three 60-inch finished diameter wet lake taps, intake screens and foundations, raw water discharge piping (final connection with the Main-03 raw water pipeline), yard piping, valve and meter vaults, structural fill, paving, construct access road to site, and construct access path to Arcadia Lake overlook.
Project Details
- Owner: Edmond Public Work Authority
- Location: Edmond, Oklahoma, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $64,741,760.00
- Completion Date: November 2025