ACWP- Little Walnut /Buttermilk Creek (Section 1 & 2)

Completed in 2008 by Oscar Renda Contracting, the ACWP- Little Walnut /Buttermilk Creek (Section 1 & 2) project consisted of two sections. Section 1 consisted of the installation by open cut of 42-inch and 18-inch FRPMP & 15-inch and 8-inch Sewer PVC. The steel casing included 2,131 linear feet of 15-inch to 42-inch diameter pipe. Jacking, boring or tunneling to include 1,711 linear feet of 18-inch and 42-inch pipeline. Pipe bursting included 1,682 linear feet of 15-inch clay wastewater line and 901linear feet of 8-inch wastewater line. Rehabilitation of existing wastewater line by cured in place pipe lining consisting of 104 linear feet of 8-inch wastewater line. Creek Stabilization, misc. concrete & asphalt repairs and appurtenances. Section 2 consisted of installation by open cut of 8-inch to 12-inch Sewer PVC. The steel casing included 1,498 linear feet of 15-inch diameter pipe. Creek Stabilization, misc. concrete & asphalt repairs and appurtenances.

Project Details

  • Owner: City of Austin
  • Location: Austin, Texas, United States
  • Performed as: Oscar Renda Contracting, Inc.
  • Project value: $9,015,792.00
  • Completion Date: January 2008