Completed in 2008 by Oscar Renda Contracting, the 108-inch Water Transmission Line Lake Fork to Lake Tawakoni Section 4 project consisted of approximately 23,501 linear feet of 108-inch reinforced concrete pipe (RCP) and 237 linear feet of 60-inch water line, construction Valve Vault/meter station, various sizes of combination air valves and appurtenances. The scope of work included clearing, grading and excavation for pipeline installation, rip rap installation and site restoration.
Project Details
- Owner: City of Dallas
- Location: Emory, Texas, United States
- Performed as: Oscar Renda Contracting, Inc.
- Project value: $31,814,686.00
- Completion Date: June 2008